When calculating the Available to Build for an assembly item, the SuiteApp can perform the calculation in two ways: Top Level All Level 1. Top Level Calculation Definition: The Top Level calculation only considers the components that are directly listed in the Bill of Materials (BOM) of the assembly item. It does not drill down… Continue reading Top Level vs. All Level in Available to Build